South Western main line









































































South Western Main Line

SWT 444025 at Poole 2005-07-16 07.jpg

British Rail Class 444 with South West Trains livery at Poole railway station

Overview
Type
Commuter rail, Suburban rail
System National Rail
Status Operational
Locale
Greater London
Surrey
Hampshire
Dorset
South East England
South West England
Termini
London Waterloo
Weymouth
Operation
Opened 1838-1840
Owner Network Rail
Operator(s)
South Western Railway
CrossCountry
Depot(s)
Clapham Junction
Wimbledon
Northam
Bournemouth
Rolling stock
Class 444 "Desiro"
Class 450 "Desiro"
Class 455
Class 456
Class 220 "Voyager"
Class 221 "Super Voyager"
Class 159 "Super Sprinter"
Technical
Line length 142 miles 64 chains (229.8 km)
Number of tracks 4 (London Waterloo to Basingstoke)
2 (Basingstoke to Moreton)
1 (Moreton to Dorchester South)
2 (Dorchester South to Weymouth)
Track gauge
1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC third rail
Operating speed 100 mph (160 km/h)

.mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output .RMir{border:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>tbody>tr{display:inline-table}.mw-parser-output .RMir>tbody>tr>td{padding:0;height:20px;min-height:20px}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMic{position:absolute;left:0px;top:0px;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir div>.RMtx{position:absolute}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}






South Western main line


Legend









































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































South Eastern main line

Left arrowLondon Charing Cross │ London Bridge Right arrow




















London Waterloo East













London Waterloo

London UndergroundLondon River Services





















London Waterloo International

1994-2007



















London Necropolis stations




1854–1902
1902–1941


























Vauxhall
London Underground

















Nine Elms



railway station and
locomotive works





1838–1848
1839–1860s








Linford curve

















Chatham main line

Left arrowLondon Victoria │ Dover and Ramsgate Right arrow








Queenstown Road













Brighton main line
to London Victoria
































West London Line
to Willesden Junction




























enlarge… junction diagram













Clapham Junction London Overground





















Brighton main line
to Brighton

















Waterloo–Reading line
via Barnes







Wandsworth

1838–1863







Earlsfield










River Wandle
























Wimbledon
depot



staff
platforms
































LU District line
and operators' diversionary route



















Sutton Loop Line
to Streatham via Haydons Road





















Wimbledon

London UndergroundTramlink




























Tramlink
to West Croydon

















Sutton Loop Line
to Sutton








Raynes Park














Sutton and Mole Valley lines
and Chessington branch line








New Malden














Kingston loop
to Shepperton branch line








Berrylands






Kingston
(L&SWR)


1838–1845







Surbiton














Hampton Court line


















New Guildford line







Esher






River Mole







Hersham






Walton-on-Thames






Weybridge














Chertsey branch line
to Virginia Water








Byfleet & New Haw






M25 motorway













Wey Navigation












Basingstoke Canal







West Byfleet






Woking














Portsmouth Direct line
to Guildford
















Brookwood Cemetery


South
North


1854–1941















London Necropolis Railway







Brookwood











Bisley Camp



World War I to Deepcut
World War II to Pirbright



1890–1952















Alton line
to Aldershot















Ascot to Aldershot line

Left arrow Ascot │ Aldershot Right arrow















North Downs Line

Left arrow Wokingham │ Guildford Right arrow








Farnborough





Bramshot Halt

1913–1946







Fleet






Winchfield






M3 motorway







Hook










River Loddon





















Reading–Basingstoke line











Basingstoke











Basingstoke and Alton Light Railway












Park Prewett

1913–1954

























Worting Junction




















Battledown Flyover
















West of England line
to Salisbury








Litchfield Tunnel





198 yd
181 m








Popham No 1 Tunnel





265 yd
242 m








Popham No 2 Tunnel





199 yd
182 m








Micheldever














Micheldever Oil Terminal







Wallers' Ash Tunnel















Mid Hants Railway to Alresford
















Didcot, Newbury and Southampton Railway
to Newbury





















Winchester Junction

























Winchester














Didcot, Newbury & Southampton Rly







M3 motorway







Shawford











Eastleigh–Romsey line







Eastleigh














Eastleigh–Fareham line












Eastleigh Works


















Southampton Airport Parkway
Southampton Airport







M27 motorway







Swaythling






Portswood

1861–1866












West Coastway line to Fareham







St Denys






Northam

1839–1840


















Northam Traincare Depot












Northam Junction












Northam

1872–1966
















Southampton Tunnel














Southampton Terminus

1840–1966














Southampton Eastern Docks







Southampton West End

1847–1895







Southampton Central






Millbrook











Southampton Western Docks























Southampton Container Terminals


















Redbridge











Wessex Main Line to Salisbury











River Test







Totton














Fawley branch line
freight only to Fawley Refinery








Ashurst New Forest






Beaulieu Road






Brockenhurst

















Lymington branch line
to Lymington Pier






















Southampton and Dorchester Railway
to Ringwood








Sway






New Milton






Hinton Admiral











Ringwood, Christchurch & Bournemouth Rwy











River Avon







Christchurch










River Stour







Pokesdown






Boscombe

1897–1965







Bournemouth East

1870–1885







Bournemouth






Meyrick Park Halt

1906–1917












Bournemouth West

1874–1965












Bournemouth Traincare Depot


















Branksome






Parkstone











Parkstone Pottery Tramway












South Western Pottery


c.1856–1967












Salterns Pier


1867–1922







Poole
Brittany Ferries












Poole Quay Line


















Somerset and Dorset Railway
to Broadstone



















Holes Bay Causeway


















Southampton and Dorchester Railway
to Broadstone













Hamworthy














Hamworthy Freight Branch
to Poole Docks













Royal Navy Cordite Factory







Holton Heath











Sandford Pottery







Wareham











Swanage Railway












Bovington Camp







Wool












UKAEA Winfrith







Moreton






Woodsford Halt

1920–1929
























Dorchester South















unbuilt line to Exeter















Heart of Wessex Line















Dorchester West











Dorchester Junction







Monkton and Came Halt

1905–1957







Bincombe Tunnel







Upwey Wishing Well Halt

1905–1957












Abbotsbury Railway


1885–1952







Upwey






Radipole Halt

1905–1984















Portland Branch Line





1902–1952 (passengers)
1902–1965 (goods)
















Weymouth















Weymouth Harbour Tramway


















Weymouth Quay









The South Western Main Line (SWML) is a 143-mile (230 km) major railway line between Waterloo station in central London and Weymouth on the south coast of England. A predominantly passenger line, it serves many commuter areas including suburbs of London such as around Hampton Court Palace and the conurbations based on Southampton and Bournemouth. It runs through the counties of Surrey, Hampshire and Dorset.


It briefly runs alongside the Windsor and Reading lines (the "Windsor lines") which terminate also at Waterloo. It has many branches, including a line to Dorking, the three lines to Guildford one of which proceeds to Portsmouth and the West of England Main Line which spurs off after Basingstoke in Hampshire to terminate officially at Exeter. Together with these, it forms the core of the network built by the London and South Western Railway, today mostly operated by South Western Railway. Network Rail refers to it as the South West Main Line.


Much of the line is relatively high-speed, with large stretches cleared for up to 100 mph (160 km/h) running. The London end of the line has as many as eight tracks plus the two Windsor Lines built separately, but this narrows to four south-west of Wimbledon and continues this way until Worting Junction west of Basingstoke, from which point most of the line is two tracks. A couple of miles from the Waterloo terminus, the line runs briefly alongside the Brighton Main Line west branch out of London Victoria, including through Clapham Junction – the busiest station in Europe by railway traffic. Tourist special services to a lesser frequency use the line such as the Cathedrals Express and Alton is a rail connection to a shorter heritage service, the Watercress Line.


The inceptive part of the line in the London Borough of Lambeth was used from 1994 to 2007 by Eurostar trains running out of 'London Waterloo International' requiring trains in this period to have a shoegear to run off the line's third rail DC electrification, following which the Central London terminus for direct European services became St Pancras International.




Contents






  • 1 Proposal


  • 2 Construction


    • 2.1 The Southampton and Dorchester Railway


    • 2.2 Rival lines and services




  • 3 Infrastructure


    • 3.1 Track


    • 3.2 Electrification




  • 4 Services


    • 4.1 Intercity


    • 4.2 Regional


    • 4.3 Outer suburban


    • 4.4 Commuter




  • 5 Future development


  • 6 See also


  • 7 References


  • 8 External links


  • 9 Bibliography





Proposal



Several companies had proposed building a faster and heavy goods reliable link from London to the South Coast around Southampton, which would have provided not only a route for commodities and passengers but one for munitions and military personnel in the event of war. At the time, Southampton was smaller than the nearby port of Portsmouth, but since Portsmouth's harbour was already well-developed due to naval operations, Southampton was the priority destination for a new railway having wide scope for development.


In 1831, the Southampton, London & Branch Railway and Docks Company (SL&BRDC) was formed, a precursor to the London and South Western Railway. The company planned to build a railway line to Southampton, but were also interested in building a line from halfway down their route towards Bristol via Newbury and Devizes. In that year the Basingstoke Canal company suggested instead that a link be built between their canal, built 1794, and the Itchen Navigation. The suggestion was rejected by those working on the railway plans and the canal company agreed not to oppose the railway.[1]


The chosen route to Southampton was not direct as it adopted a compromise axis about one third of the way down for a westward Bristol line, never built. This axis terminates shortly after the conurbation on the line of Basingstoke, then an agrarian market town. The route therefore missed the towns of Guildford, Farnham and Alton which would have boosted early revenue. The railway was also forced narrowly to bypass the town of Kingston-upon-Thames[2] due to the commercial justification that the railway would damage the town's importance for stagecoaches combined with the cost of furrowing a line through the town's easterly hill. The city of Winchester north of Southampton was included in the built and in the unbuilt proposal, seeing its station open in 1839.


The Great Western Railway (GWR) secured its patrons for a far more direct route to Bristol, particularly influential landowners in Berkshire and Wiltshire. The GWR received Parliamentary authority and shortly afterwards the Southampton railway. The SL&BRDC held to its chosen route including Basingstoke, though changed its name to the London and Southampton Railway, and later the London and South Western Railway (L&SWR). Throughout the 19th century, the L&SWR and Great Western Railway were often in competition with each other over serving destinations and frequently sought and gained permission to build railways into each other's intended "territory".



Construction


The first section to be opened was from Nine Elms, the LSWR's first London terminus, in Battersea, to Woking (then named Woking Common) on 21 May 1838.


The remainder of the main line followed over the next two years:



  • Woking to Winchfield (Shapley Heath): 24 September 1838

  • Winchfield to Basingstoke: 10 June 1839

  • Winchester to Southampton: 10 June 1839

  • Basingstoke to Winchester: 11 May 1840. This last section was the most difficult on the route with a long initial climb necessitating earthworks to Litchfield Tunnel and on a ten-mile descent to Winchester which lies on the River Itchen.



The Southampton and Dorchester Railway


The Southampton and Dorchester Railway was also formed and built a line from 1845 to 1847 from Southampton to Dorchester. It avoided Bournemouth, then barely a village, and ran via Wimborne Minster and Ringwood before reaching Dorchester. It took a winding route, which followed the easiest-to-construct links rather than linking settlements in a straight line. In particular, due to intervention by the Commissioners of Woods and Forests, the route between Southampton and Ringwood had to take a southward diversion through Brockenhurst, rather than the straight route through Lyndhurst that the company had envisioned.[3] The line also bypassed Poole. Initially, Poole was served by a branch from Hamworthy (initially named Poole Junction) to a station on the opposite side of Holes Bay.


The Ringwood line was nicknamed as 'Castleman's Corkscrew' after Charles Castleman, a major figure in the enterprise.[4] The line was originally planned to continue towards Exeter, but this never came into effect. In 1865 the railway was connected to the GWR line to Weymouth, which now forms the current terminus of the line.


A branch was built in the 1870s from Broadstone to central Poole that continued eastwards to Bournemouth, a town that was now developing as a seaside resort. From 1886-88, a line was then built from Brockenhurst to Bournemouth. A causeway was also built across Holes Bay to connect Poole to Hamworthy. In time, the straighter route through Bournemouth and Poole superseded the Ringwood line. The Ringwood line was closed by the Beeching Axe.



Rival lines and services


The L&SWR's biggest rival was the Great Western Railway (GWR) who had originally cut the L&SWR's plans by building the line to Bristol. Both companies built several railways from their own networks into each other's intended territory.


In 1848, the GWR built a branch from Reading to Basingstoke. At first this was a fairly quiet railway with a terminus separate from the L&SWR's mainline station. However, when the rival company adopted standard gauge, a link was constructed between the two lines. This later became used for a freight route from Southampton to the Midlands via Oxford. Following the closure of the Somerset and Dorset Joint Railway, this route became used by long-distance services from Bournemouth to the Midlands.


Another line was built in 1873 southward (Didcot, Newbury and Southampton Railway). Originally, L&SWR ruled out allowing the line to use its own track. However the DN&SR fell into financial difficulties, and negotiations allowed its trains to use the South Western Main Line south of Winchester.


GWR also proposed building a line from Reading to Portsmouth via Basingstoke and Alton but L&SWR found a cheaper solution for building the northern stretch from Basingstoke to Alton by using a light railway. The Basingstoke and Alton Light Railway stopped a rival's Portsmouth line from being built at the all-too-common cost of being, for most of its existence, unprofitable - it saw an eight-year resurrection but again became loss-making and closed in 1932 save for goods. In 1955 similarly the southern stretch, the Meon Valley Railway, closed to passengers.



Infrastructure



Track


Between London Waterloo and Clapham Junction, the line has eight tracks. It runs over the Nine Elms to Waterloo Viaduct for much of its length. It crosses beneath the Chatham Main Line where the Brighton Main Line runs alongside it on the southern side. At Clapham Junction, some of these tracks leave on the Waterloo to Reading Line and the remaining tracks are reduced to four. The Brighton Line, which also has four tracks, separates from it shortly afterwards.


The four tracks initially have a pair of "slow" tracks to the east with the two "fast" tracks on the western side. This arrangement continues to north of Wimbledon where a flyover transfers the northbound slow line across the fast lines, leaving the inner tracks being used for the fast services and the stopping services using the outer tracks. This arrangement continues to Worting Junction, just after Basingstoke. Many stations on this section had island platforms which have since been removed - this is evident with wide gaps between station platforms as stations such as Winchfield. The island platforms survive at New Malden, Esher and Walton-on-Thames, with the latter now covered in weeds.


The line continues as double-track to Winchester but expands to three tracks through Shawford station with one up platform and fast and slow down platforms. There are four tracks from Shawford to Eastleigh. The line from Romsey via Chandler's Ford trails in just north of Eastleigh which is also the junction for the Fareham line. The line returns to double track until St Denys where the West Coastway Line trails in. At Northam the original route to Southampton Terminus carries on south towards Eastern Docks and the main route curves west to enter a tunnel through to Southampton Central station.


The line remains double-tracked most of the way to Weymouth, but there is a single-track section between Moreton and Dorchester South which constrains capacity.[5]



Electrification




A British Rail Class 73 with a parcels van and carriages heading on the fast lines through Clapham Junction in 1986


The 'Surrey section', about half of which has become Greater London, was electrified, as far west as Pirbright Junction (for Alton) using the (750 V DC third rail) system, by the London & South Western Railway or its successor, the Southern Railway before World War II.


The bulk of the line (that is from Pirbright Junction to Bournemouth/Bournemouth Depot) was electrified in 1967. From then until 1988 trains on the Bournemouth to Weymouth section operated a push-pull system. One or two BR Class 438 4-TC units would be propelled from London to Bournemouth by a BR Class 432 4-REP unit, controlled from the leading cab of the former. At Bournemouth, one or both of the Class 438 4-TCs would continue over the unelectrified line to Weymouth hauled by a BR Class 33/1 diesel locomotive. Trains from Weymouth would follow the same procedure in reverse.


Electrification was extended to Weymouth in 1988 and saw the introduction of the new BR Class 442 5-WES Wessex Electric trains. These were withdrawn by February 2007; Class 444 5-DES and Class 450 4-DES trains are now used.



Services


The majority of passenger services are currently operated by South Western Railway. Other passengers services are operated by CrossCountry.



Intercity


Intercity services run as follows (Monday-Saturday off-peak):



  • Two trains per hour from London Waterloo to Weymouth, with:

    • One calling at Woking, Winchester, Southampton Airport Parkway, Southampton Central, Brockenhurst, Bournemouth, all stations to Hamworthy, Wareham, Dorchester South and Weymouth. This is the only scheduled service which passes through Basingstoke without stopping.

    • One calling at Clapham Junction, Basingstoke, Winchester, Southampton Airport Parkway, Southampton Central, Brockenhurst, New Milton, Christchurch, Pokesdown, Bournemouth, Poole and all stations to Weymouth. This is one of only two scheduled services per hour not to stop at Woking.



  • Three CrossCountry trains every two hours, most calling at Basingstoke, Winchester, Southampton Airport Parkway, Southampton Central, Brockenhurst and Bournemouth:

    • One between Southampton Central and Newcastle via Birmingham New Street (2-hourly)

    • One between Bournemouth and Manchester Piccadilly via Birmingham New Street (hourly)



  • Two trains per hour between London Waterloo and Salisbury (of which one per hour continues to Exeter St. David's), calling at Clapham Junction (alternate trains only), Woking and Basingstoke before branching off on the West of England Main Line.

  • During the Wimbledon tennis championships, some long-distance trains between Waterloo and a variety of destinations make an additional stop at Wimbledon in the morning on the up fast line from around 10am to 12.30pm and on the down fast line from 7pm until midnight.[6]



Regional



  • One train per hour to Poole (stopping service), calling at Clapham Junction, Farnborough (Main), Fleet, Basingstoke, Winchester, Shawford, Eastleigh, Southampton Airport Parkway, Southampton Central, Totton, Ashurst New Forest, Brockenhurst and all stations to Poole.

  • One train per hour to Portsmouth Harbour, calling at Woking, Farnborough (Main), Basingstoke, Micheldever, Winchester and Eastleigh, before branching off to serve the Eastleigh to Fareham line.



Outer suburban



  • Two trains per hour between London Waterloo and Alton, calling at Clapham Junction (alternate trains only), Surbiton, West Byfleet, Woking and Brookwood before continuing to Alton down the Alton Line.

  • Two trains per hour between London Waterloo and Basingstoke, calling at Clapham Junction (alternate trains only), Surbiton, Walton-on-Thames, Weybridge, Woking and all stations to Basingstoke.

  • On Sundays, trains on these routes additionally call at Wimbledon.



Commuter


There are also many commuter services serving London. Those of note are:



  • Two trains per hour between London Waterloo and Woking, calling at Vauxhall, Clapham Junction, Earlsfield, Wimbledon, Surbiton and all stations to Woking.

  • Two trains per hour between London Waterloo and Hampton Court, calling at Vauxhall, Clapham Junction and all stations to Surbiton before continuing down the Hampton Court Branch Line.

  • Two trains per hour between London Waterloo and Guildford (via Cobham), calling at Vauxhall, Clapham Junction, Earlsfield, Wimbledon, Surbiton and all stations to Guildford via the New Guildford Line.

  • One train per hour between Romsey and Salisbury via Southampton Central, using the Eastleigh to Romsey Line and part of the Wessex Main Line. Travelling in a 'figure of six' route, trains from Salisbury go to Romsey, then call at Redbridge and all stations to Eastleigh, where the train leaves the SWML to return to Romsey.



Future development


In July 2011, Network Rail in its London & South East Route Utilisation Strategy (RUS) recommended adding a fifth track to the four-track stretch of line between Clapham Junction and Surbiton. This was found to be feasible within the existing land (rail corridor), and was seen as the most practicable way of providing more capacity on the route. It would permit up to eight additional trains to run in the peak hour, for a maximum of 32 trains in this stretch. The scheme would also entail more flexible track use, modifying one Windsor Line track to permit use by mainline trains. Options rejected in the RUS as not viable included double-deck trains, building a flyover at Woking, and introducing 12- or 16-car trains.[7]



See also




  • Chelsea-Hackney line (possible route of proposed cross-London line to relieve congestion)


  • Crossrail 2 (plans to provide another cross-London set of routes and increase services to tourist destinations and suburban stations partly or wholly on the route)



References





  1. ^ Patterson, A. Temple (1966). A History of Southampton 1700-1914 Vol.I An Oligarchy in Decline 1700-1835. The University of Southampton. p. 167..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output .citation q{quotes:"""""""'""'"}.mw-parser-output .citation .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-ws-icon a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-maint{display:none;color:#33aa33;margin-left:0.3em}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  2. ^ Railways South East


  3. ^ "Act of Parliament 21st July 1845 - Southampton and Dorchester Railway Act". London Gazette. 5508. 21 July 1845.


  4. ^ Bournemouth Railway History, Lawrence Popplewell


  5. ^ "Route plans 2008 Route plan 3 South West Main Line" (PDF). 2008. Retrieved 23 October 2010.


  6. ^ "Tennis At Wimbledon" (PDF). South West Trains. Retrieved 29 November 2015.


  7. ^ Broadbent, Steve (10 August 2011). "London RUS suggests fifth track on South West line". Rail. Peterborough. p. 8.




External links



  • Basingstoke's Railway History

  • Network Rail's Route Utilisation Strategy for the South West Main Line



Bibliography




  • Butt, R.V.J. (1995). The Directory of Railway Stations. Patrick Stephens Ltd. ISBN 1-85260-508-1.


  • Lucking, J.H. (1968). Railways of Dorset. Railway Correspondence and Travel Society.


  • Mitchell, Vic; Smith, Keith (1992). Branch Lines Around Wimborne. Middleton Press. ISBN 0-906520-97-5.

















Popular posts from this blog

Florida Star v. B. J. F.

Danny Elfman

Lugert, Oklahoma