Who starts the daily scrum meeting?












3














Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now










share|improve this question
























  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 '18 at 13:47






  • 1




    I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    Nov 13 '18 at 8:30
















3














Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now










share|improve this question
























  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 '18 at 13:47






  • 1




    I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    Nov 13 '18 at 8:30














3












3








3







Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now










share|improve this question















Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now







scrum agile meetings daily-scrum scrum-ceremonies






share|improve this question















share|improve this question













share|improve this question




share|improve this question








edited Dec 13 '18 at 12:07









Goncalo Peres

285125




285125










asked Nov 12 '18 at 13:19









Sujatha Kannan

161




161












  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 '18 at 13:47






  • 1




    I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    Nov 13 '18 at 8:30


















  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 '18 at 13:47






  • 1




    I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    Nov 13 '18 at 8:30
















Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
– Sujatha Kannan
Nov 12 '18 at 13:47




Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
– Sujatha Kannan
Nov 12 '18 at 13:47




1




1




I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
– Tiago Cardoso
Nov 13 '18 at 8:30




I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
– Tiago Cardoso
Nov 13 '18 at 8:30










6 Answers
6






active

oldest

votes


















4














The team should decide. The meeting belongs to the team.



If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






share|improve this answer





























    2














    The Scrum Master should coach the team to be self-managing so that they decide and find a way of handling this themselves i.e. if they want to have a specific person, a specific scenario e.g. last joiner or they ask the Scrum Master to nominate someone every day, its totally up to the team.



    If the team repeatedly don't start the standup and they just stand around chatting then the Scrum Master needs to coach them by addressing this in workshops and retrospectives and one on ones to make sure they understand what the standup is for and why its important to kick if off on time and time-box it to 15 minutes.



    Please bare in mind that a Scrum Master is not mandatory at stand-ups, mature teams don't need their scrum master at every standup and they might focus on a second team or another problem and not attend.






    share|improve this answer





























      1














      As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



      If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






      share|improve this answer





























        0














        The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




        1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

        2. If your team use token as sign, who own token will start first.

        3. Or Scrum master decide who will start (No recomend).


        Please share your ideas, I think we have no answer for the type of question, just best practice.






        share|improve this answer





























          0














          Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






          share|improve this answer





























            0














            nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




            • Everyone should start at least once every certain time

            • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

            • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

            • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

            • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






            share|improve this answer





















              Your Answer








              StackExchange.ready(function() {
              var channelOptions = {
              tags: "".split(" "),
              id: "208"
              };
              initTagRenderer("".split(" "), "".split(" "), channelOptions);

              StackExchange.using("externalEditor", function() {
              // Have to fire editor after snippets, if snippets enabled
              if (StackExchange.settings.snippets.snippetsEnabled) {
              StackExchange.using("snippets", function() {
              createEditor();
              });
              }
              else {
              createEditor();
              }
              });

              function createEditor() {
              StackExchange.prepareEditor({
              heartbeatType: 'answer',
              autoActivateHeartbeat: false,
              convertImagesToLinks: false,
              noModals: true,
              showLowRepImageUploadWarning: true,
              reputationToPostImages: null,
              bindNavPrevention: true,
              postfix: "",
              imageUploader: {
              brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
              contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
              allowUrls: true
              },
              noCode: true, onDemand: true,
              discardSelector: ".discard-answer"
              ,immediatelyShowMarkdownHelp:true
              });


              }
              });














              draft saved

              draft discarded


















              StackExchange.ready(
              function () {
              StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fpm.stackexchange.com%2fquestions%2f25211%2fwho-starts-the-daily-scrum-meeting%23new-answer', 'question_page');
              }
              );

              Post as a guest















              Required, but never shown

























              6 Answers
              6






              active

              oldest

              votes








              6 Answers
              6






              active

              oldest

              votes









              active

              oldest

              votes






              active

              oldest

              votes









              4














              The team should decide. The meeting belongs to the team.



              If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






              share|improve this answer


























                4














                The team should decide. The meeting belongs to the team.



                If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






                share|improve this answer
























                  4












                  4








                  4






                  The team should decide. The meeting belongs to the team.



                  If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






                  share|improve this answer












                  The team should decide. The meeting belongs to the team.



                  If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.







                  share|improve this answer












                  share|improve this answer



                  share|improve this answer










                  answered Nov 12 '18 at 15:31









                  Vicki Laidler

                  2,196615




                  2,196615























                      2














                      The Scrum Master should coach the team to be self-managing so that they decide and find a way of handling this themselves i.e. if they want to have a specific person, a specific scenario e.g. last joiner or they ask the Scrum Master to nominate someone every day, its totally up to the team.



                      If the team repeatedly don't start the standup and they just stand around chatting then the Scrum Master needs to coach them by addressing this in workshops and retrospectives and one on ones to make sure they understand what the standup is for and why its important to kick if off on time and time-box it to 15 minutes.



                      Please bare in mind that a Scrum Master is not mandatory at stand-ups, mature teams don't need their scrum master at every standup and they might focus on a second team or another problem and not attend.






                      share|improve this answer


























                        2














                        The Scrum Master should coach the team to be self-managing so that they decide and find a way of handling this themselves i.e. if they want to have a specific person, a specific scenario e.g. last joiner or they ask the Scrum Master to nominate someone every day, its totally up to the team.



                        If the team repeatedly don't start the standup and they just stand around chatting then the Scrum Master needs to coach them by addressing this in workshops and retrospectives and one on ones to make sure they understand what the standup is for and why its important to kick if off on time and time-box it to 15 minutes.



                        Please bare in mind that a Scrum Master is not mandatory at stand-ups, mature teams don't need their scrum master at every standup and they might focus on a second team or another problem and not attend.






                        share|improve this answer
























                          2












                          2








                          2






                          The Scrum Master should coach the team to be self-managing so that they decide and find a way of handling this themselves i.e. if they want to have a specific person, a specific scenario e.g. last joiner or they ask the Scrum Master to nominate someone every day, its totally up to the team.



                          If the team repeatedly don't start the standup and they just stand around chatting then the Scrum Master needs to coach them by addressing this in workshops and retrospectives and one on ones to make sure they understand what the standup is for and why its important to kick if off on time and time-box it to 15 minutes.



                          Please bare in mind that a Scrum Master is not mandatory at stand-ups, mature teams don't need their scrum master at every standup and they might focus on a second team or another problem and not attend.






                          share|improve this answer












                          The Scrum Master should coach the team to be self-managing so that they decide and find a way of handling this themselves i.e. if they want to have a specific person, a specific scenario e.g. last joiner or they ask the Scrum Master to nominate someone every day, its totally up to the team.



                          If the team repeatedly don't start the standup and they just stand around chatting then the Scrum Master needs to coach them by addressing this in workshops and retrospectives and one on ones to make sure they understand what the standup is for and why its important to kick if off on time and time-box it to 15 minutes.



                          Please bare in mind that a Scrum Master is not mandatory at stand-ups, mature teams don't need their scrum master at every standup and they might focus on a second team or another problem and not attend.







                          share|improve this answer












                          share|improve this answer



                          share|improve this answer










                          answered Dec 4 '18 at 16:07









                          user32613

                          53111




                          53111























                              1














                              As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                              If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






                              share|improve this answer


























                                1














                                As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                                If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






                                share|improve this answer
























                                  1












                                  1








                                  1






                                  As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                                  If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






                                  share|improve this answer












                                  As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                                  If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.







                                  share|improve this answer












                                  share|improve this answer



                                  share|improve this answer










                                  answered Nov 12 '18 at 14:14









                                  nvoigt

                                  3,124815




                                  3,124815























                                      0














                                      The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                                      1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                                      2. If your team use token as sign, who own token will start first.

                                      3. Or Scrum master decide who will start (No recomend).


                                      Please share your ideas, I think we have no answer for the type of question, just best practice.






                                      share|improve this answer


























                                        0














                                        The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                                        1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                                        2. If your team use token as sign, who own token will start first.

                                        3. Or Scrum master decide who will start (No recomend).


                                        Please share your ideas, I think we have no answer for the type of question, just best practice.






                                        share|improve this answer
























                                          0












                                          0








                                          0






                                          The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                                          1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                                          2. If your team use token as sign, who own token will start first.

                                          3. Or Scrum master decide who will start (No recomend).


                                          Please share your ideas, I think we have no answer for the type of question, just best practice.






                                          share|improve this answer












                                          The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                                          1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                                          2. If your team use token as sign, who own token will start first.

                                          3. Or Scrum master decide who will start (No recomend).


                                          Please share your ideas, I think we have no answer for the type of question, just best practice.







                                          share|improve this answer












                                          share|improve this answer



                                          share|improve this answer










                                          answered Nov 12 '18 at 13:32









                                          PeaceInMind

                                          1034




                                          1034























                                              0














                                              Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






                                              share|improve this answer


























                                                0














                                                Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






                                                share|improve this answer
























                                                  0












                                                  0








                                                  0






                                                  Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






                                                  share|improve this answer












                                                  Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.







                                                  share|improve this answer












                                                  share|improve this answer



                                                  share|improve this answer










                                                  answered Nov 12 '18 at 14:45









                                                  Mike Robinson

                                                  1853




                                                  1853























                                                      0














                                                      nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                                      • Everyone should start at least once every certain time

                                                      • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                                      • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                                      • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                                      • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






                                                      share|improve this answer


























                                                        0














                                                        nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                                        • Everyone should start at least once every certain time

                                                        • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                                        • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                                        • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                                        • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






                                                        share|improve this answer
























                                                          0












                                                          0








                                                          0






                                                          nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                                          • Everyone should start at least once every certain time

                                                          • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                                          • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                                          • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                                          • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






                                                          share|improve this answer












                                                          nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                                          • Everyone should start at least once every certain time

                                                          • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                                          • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                                          • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                                          • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts







                                                          share|improve this answer












                                                          share|improve this answer



                                                          share|improve this answer










                                                          answered Nov 12 '18 at 16:49









                                                          Roberto Anzaldua

                                                          893112




                                                          893112






























                                                              draft saved

                                                              draft discarded




















































                                                              Thanks for contributing an answer to Project Management Stack Exchange!


                                                              • Please be sure to answer the question. Provide details and share your research!

                                                              But avoid



                                                              • Asking for help, clarification, or responding to other answers.

                                                              • Making statements based on opinion; back them up with references or personal experience.


                                                              To learn more, see our tips on writing great answers.





                                                              Some of your past answers have not been well-received, and you're in danger of being blocked from answering.


                                                              Please pay close attention to the following guidance:


                                                              • Please be sure to answer the question. Provide details and share your research!

                                                              But avoid



                                                              • Asking for help, clarification, or responding to other answers.

                                                              • Making statements based on opinion; back them up with references or personal experience.


                                                              To learn more, see our tips on writing great answers.




                                                              draft saved


                                                              draft discarded














                                                              StackExchange.ready(
                                                              function () {
                                                              StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fpm.stackexchange.com%2fquestions%2f25211%2fwho-starts-the-daily-scrum-meeting%23new-answer', 'question_page');
                                                              }
                                                              );

                                                              Post as a guest















                                                              Required, but never shown





















































                                                              Required, but never shown














                                                              Required, but never shown












                                                              Required, but never shown







                                                              Required, but never shown

































                                                              Required, but never shown














                                                              Required, but never shown












                                                              Required, but never shown







                                                              Required, but never shown







                                                              Popular posts from this blog

                                                              Florida Star v. B. J. F.

                                                              Error while running script in elastic search , gateway timeout

                                                              Adding quotations to stringified JSON object values