Skip to main content

STS-122











STS-122




From Wikipedia, the free encyclopedia






Jump to navigation
Jump to search


















































































































































STS-122

STS122 launch.jpg

Atlantis launches with Columbus

Mission type ISS assembly
Operator NASA
COSPAR ID 2008-005A
SATCAT no.
32486
Mission duration 12 days, 18 hours, 21 minutes, 50 seconds[1]
Distance travelled 8,500,000 kilometres (5,300,000 mi)
Orbits completed 202

Spacecraft properties
Spacecraft
Space Shuttle Atlantis
Launch mass 121,264 kilograms (267,341 lb)
Landing mass 93,536 kilograms (206,212 lb)

Crew
Crew size 7
Members
Stephen Frick
Alan G. Poindexter
Leland D. Melvin
Rex J. Walheim
Hans Schlegel
Stanley G. Love
Launching Léopold Eyharts
Landing Daniel M. Tani

Start of mission
Launch date 7 February 2008, 19:45 (2008-02-07UTC19:45Z) UTC[2]
Launch site
Kennedy LC-39A

End of mission
Landing date 20 February 2008, 14:07:10 (2008-02-20UTC14:07:11Z) UTC[1]
Landing site
Kennedy SLF Runway 15

Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee 331 kilometres (206 mi)[3]
Apogee 339 kilometres (211 mi)[3]
Inclination 51.6 degrees[3][4]
Period 91.23 minutes[3]
Epoch 9 February 2008[3]

Docking with ISS
Docking port
PMA-2
(Harmony forward)
Docking date 9 February 2008, 17:17 UTC
Undocking date 18 February 2008, 09:24 UTC
Time docked 8 days, 16 hours, 7 minutes


STS-122 patch.svgSTS-122crew.jpg
Left to right - Front row: Frick, Eyharts, Poindexter; Back row: Melvin, Walheim, Love, Schlegel
Space Shuttle program


← STS-120


STS-123 →

 

STS-122 was a NASA Space Shuttle mission to the International Space Station (ISS), flown by the Space Shuttle Atlantis. STS-122 marked the 24th shuttle mission to the ISS, and the 121st space shuttle flight overall.[4]


The mission was also referred to as ISS-1E by the ISS program. The primary objective of STS-122 was to deliver the European Columbus science laboratory, built by the European Space Agency (ESA), to the station. It also returned Expedition 16 Flight Engineer Daniel M. Tani to Earth. Tani was replaced on Expedition 16 by Léopold Eyharts, a French Flight Engineer representing ESA. After Atlantis' landing, the orbiter was prepared for STS-125, the final servicing mission for the Hubble Space Telescope.


The original target launch date for STS-122 was 6 December 2007, but due to engine cutoff sensor (ECO) reading errors, the launch was postponed to 9 December 2007.[5] During the second launch attempt, the sensors failed again, and the launch was halted.[6] A tanking test on 18 December 2007 revealed the probable cause to lie with a connector between the external tank and the shuttle. The connector was replaced and the shuttle launched during the third attempt on 7 February 2008.[2][7]




Contents






  • 1 Crew


  • 2 Mission payloads


    • 2.1 Outreach




  • 3 Mission background


  • 4 Shuttle processing


    • 4.1 Launch preparations


    • 4.2 6 December (launch attempt 1)


    • 4.3 9 December (Launch attempt 2)


    • 4.4 ECO sensor troubleshooting and recovery


    • 4.5 Radiator Retract Hose




  • 5 Mission timeline


    • 5.1 7 February (Flight day 1, Launch)


    • 5.2 8 February (Flight day 2)


    • 5.3 9 February (Flight day 3)


    • 5.4 10 February (Flight day 4)


    • 5.5 11 February (Flight day 5)


    • 5.6 12 February (Flight day 6)


    • 5.7 13 February (Flight day 7)


    • 5.8 14 February (Flight day 8)


    • 5.9 15 February (Flight day 9)


    • 5.10 16 February (Flight day 10)


    • 5.11 17 February (Flight day 11)


    • 5.12 18 February (Flight day 12)


    • 5.13 19 February (Flight day 13)


    • 5.14 20 February (Flight day 14, Landing)




  • 6 Extra-vehicular activity


  • 7 Wake-up calls


  • 8 Media


  • 9 See also


  • 10 References


  • 11 External links





Crew[edit]










































Position[8][9]
Launching Astronaut
Landing Astronaut
Commander

United States Stephen Frick
Second and last spaceflight
Pilot

United States Alan G. Poindexter
First spaceflight
Mission Specialist 1

United States Leland D. Melvin
First spaceflight
Mission Specialist 2

United States Rex J. Walheim
Second spaceflight
Mission Specialist 3

Germany Hans Schlegel, ESA
Second and last spaceflight
Mission Specialist 4

United States Stanley G. Love
Only spaceflight
Mission Specialist 5

France Léopold Eyharts, ESA
Expedition 16
Second and last spaceflight
ISS Flight Engineer

United States Daniel M. Tani
Expedition 16
Second and last spaceflight
ISS Flight Engineer


Mission payloads[edit]





Columbus at Kennedy Space Center




ICC-Lite STS-122


STS-122 was the ISS Assembly Flight 1E, which delivered the European Columbus laboratory module to the station, along with the Biolab, Fluid Science Laboratory (FSL), European Drawer Rack (EDR), and European Physiology Modules (EPM) payloads.[10]


STS-122 also carried the Solar Monitoring Observatory (SOLAR), the European Technology Exposure Facility (EuTEF), and a new Nitrogen Tank Assembly, mounted in the cargo bay of an ICC-Lite payload rack, as well as a spare Drive Lock Assembly (DLA) sent to orbit in support of possible repairs to the starboard Solar Alpha Rotary Joint (SARJ) which is malfunctioning.[11]


Several items were returned with Atlantis: A malfunctioning Control Moment Gyroscope (CMG) that was swapped out with a new one during STS-118, and the empty Nitrogen Tank Assembly will be placed in the orbiter's payload bay, along with a trundle bearing from the Starboard SARJ that was removed during an EVA performed by Expedition 16.[11][12]





















































Location
Cargo
Mass
Bay 1–2
Orbiter Docking System
EMU 3015 / EMU 3017
1,800 kilograms (4,000 lb)
~240 kilograms (530 lb)
Bay 3P
Shuttle Power
Distribution Unit (SPDU)
~100 kilograms (220 lb)
Bay 5P
Power/Data Grapple
Fixture (PDGF) for Columbus
71 kilograms (157 lb)
Bay 6
ICC-LITE with EUTEF, SOLAR, NTA
2,063 kilograms (4,548 lb)
Bay 7P
ECSH (EVA Cargo Stowage) on APC
~100 kilograms (220 lb)
Bay 8–12

Columbus Orbital Facility
12,077 kilograms (26,625 lb)
Starboard Sill

Orbiter Boom Sensor System
~450 kilograms (990 lb)
Port Sill

Canadarm
~410 kilograms (900 lb)


Total:

17,311 kilograms (38,164 lb)




Illustration of the ISS after STS-122, highlighting the addition of the Columbus laboratory module.



Outreach[edit]


Stowed within the Official Flight Kit (OFK), Atlantis carried three green starting flags provided by NASCAR in recognition of the 50th running of the Daytona 500 on 17 February 2008, and the 50th anniversary of NASA on 1 October 2008. Once returned to Earth, one of the flown flags will be placed on public display at the Daytona International Speedway in Florida, one will be presented to Ryan Newman, the winner of the 2008 Daytona 500, and the third will be used by NASA as part of its anniversary activities.[13]



Mission background[edit]


The mission marks:[4][14][15]



  • 152nd NASA manned spaceflight.

  • 121st space shuttle flight since STS-1.

  • 29th flight of Atlantis

  • 96th post-Challenger mission.

  • 8th post-Columbia mission.

  • 8th visit to the International Space Station for Atlantis.

  • 300th US astronaut in space.



Shuttle processing[edit]





Atlantis arrived at Launch pad 39A on 10 November.




The external tank LH2 cut-off sensors shown here have repeatedly delayed the STS-122 launch.



Launch preparations[edit]


The external tank (ET-125) arrived at the Kennedy Space Center on 14 September 2007, after traveling by barge from the Michoud Assembly Facility in Louisiana. The external tank was then transferred to the Vehicle Assembly Building (VAB) to be inspected, and have the Liquid oxygen feedline bracket modified, before being mated to the solid rocket boosters on 17 October 2007.


The external tank was attached to the solid rocket boosters on 18 October 2007, and Atlantis moved to the VAB on 3 November 2007.[16] With the entire stack placed upon the Mobile Launcher Platform, Atlantis moved to launch pad 39A on 10 November 2007, and the Columbus module was loaded into the orbiter's payload bay on 12 November.[17] The terminal countdown demonstration test was completed on 20 November 2007.[18]


Following the final Flight Readiness Review on 30 November 2007, NASA managers announced that Atlantis was ready to fly, and the launch date of 6 December 2007 was confirmed.[19] The crew arrived at Kennedy Space Center on 3 December 2007, to prepare for the first launch attempt on 6 December 2007.[20]



6 December (launch attempt 1)[edit]


On Thursday, 6 December 2007, 16 minutes into the loading of the liquid hydrogen and liquid oxygen into the external tank, two of the four liquid hydrogen engine cutoff (ECO) sensors failed to respond correctly, resulting in Launch Director Doug Lyons deciding to postpone the launch.[5][21] The fuel cutoff sensor system is one of a series of redundant systems that protect the shuttle's main engines, by triggering engine shutdown if fuel runs unexpectedly low. The Launch Commit Criteria (LCC) require that three of the four sensor systems function properly prior to liftoff.[5] The scheduled launch time was tentatively postponed 48 hours to 8 December 2007, at 15:43 EST (20:43 UTC).[21][22][23]


On 7 December 2007, managers evaluated the options to fly, under the flight rationale guidelines. The issue was thought to be in the wiring inside the external tank, that results in the ECO sensors reporting incorrectly.[24] During loading, testing of the ECO sensors is done to ensure they function properly, but when the "dry tank" command was sent, the third and fourth sensors continued to report "wet" conditions. The concern was that if the tank were about to run dry, the sensors that control the shutdown of the shuttle's main engines might not send the shutdown command, resulting in running the engines without fuel, a dangerous situation. Managers evaluated if the Launch Commit Criteria could be removed, allowing Atlantis to fly with two of four sensors, and augment the LCO system with on-ground monitoring of propellant use by the Flight Control staff. The other option would involve repair or replacement of the sensors, which would most likely require the orbiter be moved back into the Vehicle Assembly Building, and would rule out a December launch.[24]


Following the Mission Management Team meeting on 7 December 2007, Shuttle Program Director Wayne Hale explained during the press briefing that the team had discussed the issues at length, and had tentatively decided to attempt a Sunday launch.[25][26] The Launch Commit Criteria would be changed, and Flight Controller procedures would be finalized to allow for additional monitoring of the ECO system during ascent.[25] One of the changes to the LCC will be the requirement that during tanking, all four sensors must be operational. In the past, when this system has failed during the initial launch attempt, all four sensors performed normally during the next attempt. If this were the case for Sunday's launch attempt, it would be consistent with what has been seen in the past. If the sensors fail during re-tanking on 9 December 2007, this would indicate that the issue is not consistent with the evidence seen in the past. Managers would hold an MMT meeting on 8 December 2007 to further discuss this rationale, and the Flight Controller procedures, before making a final decision.[25]


On 8 December 2007, the Mission Management Team met to finalize plans for the Sunday launch, and discuss possible launch options.[27][28] There was a unanimous decision to attempt a Sunday launch using the modified Launch Commit Criteria.[27][28] The modified criteria require all four ECO sensors to function normally during tanking, include the implementation of a Flight Controller procedure to continue monitoring the ECO sensors after liftoff during ascent, and shorten the launch window from five minutes to one minute to conserve fuel.[28] Those changes would be done only for the launch of STS-122, and are not permanent changes. Should any of the sensors give errors during tanking, the launch attempt would be scrubbed. Following STS-122, Space Shuttle Program Director Wayne Hale and Mission Management Team Chairman LeRoy Cain explained that there would be a variety of activities and procedures put into effect to address the ECO issues. A multi-center troubleshooting team would be convened, and changes to the main engines would be performed, to improve the way the engines use and control the liquid hydrogen reserves, including upgrades to the flow meters inside the engines.[28]



9 December (Launch attempt 2)[edit]




Engineers Peter Johnson and Dr. Carlos Mata working on the time-domain reflectometry equipment inside the MLP.




Close-up of the pin soldering process


Fueling of Atlantis began at 05:55 EST (10:55 UTC). During fueling at 06:52 EST, the third ECO sensor failed wet, violating the modified Launch Commit Criteria that required all four sensors to function properly. The launch was officially scrubbed at 07:25 EST (12:25 UTC). Troubleshooting the problem would rule out a December launch.[29] NASA finally gave a new launch date of 10 January 2008.[30]


During the post-scrub news conference, Launch Director Doug Lyons said that a rollback to the Vehicle Assembly Building was not a situation managers were considering currently, and explained that the pad offers extensive access to the systems for troubleshooting and investigation.[31] "We can do extensive troubleshooting out there before we would entertain rolling back. There's not many things we can't do out at the launch pad that we could do in the VAB."[31] Managers have convened a short-term troubleshooting team to design a plan to identify, and hopefully predict, or prevent the ECO anomaly.[31]



ECO sensor troubleshooting and recovery[edit]


After the second failed launch attempt, NASA initiated a search for the root cause of the ECO sensor problem. In order to gather more data they scheduled a tanking test for 18 December 2007. Engineers installed test wiring that was leading from the tail mast of the orbiter into the interior of the Mobile Launcher Platform (MLP), where Time-domain reflectometry (TDR) test equipment was installed to test the ECO sensor system. Engineer Peter Johnson and Dr. Carlos T. Mata operated two TDRs to gather data about the characteristics of the behaviour of the sensor circuitry before, during, and after tanking. NASA was able to pinpoint the problem to the LH2 external tank feed-through connector.



Radiator Retract Hose[edit]


During launch preparations at Kennedy, technicians noticed a small section of the aft radiator retract hose that was bent in a shape similar to the Greek letter Omega.[32][33] The hose is part of the shuttle's cooling system that carries Freon, and is designed to flex when the payload bay doors are opened and closed.[34] Making sure they were not overlooking potential problems, NASA engineers designed a tool to guide the hose back into the storage box, and performed the procedure on 3 February 2008.[32] Engineers would monitor the hose during STS-122, and in the unlikely event that it were to begin leaking Freon, the shuttle's computers would turn off the redundant radiator system before any Freon had a chance to leak out.[34]











































Attempt Planned Result Turnaround Reason Decision point Weather go (%) Notes
1 6 Dec 2007, 4:31:44 pm scrubbed technical 30%[35]
fault in Engine Cut Off (ECO) sensors
2 9 Dec 2007, 3:21:00 pm scrubbed 2 days, 22 hours, 49 minutes technical 8 Dec 2007, 7:25 am 30%[36]
fault in Engine Cut Off (ECO) sensors
3 7 Feb 2008, 5:45:30 pm success 60 days, 2 hours, 25 minutes


Mission timeline[edit]



7 February (Flight day 1, Launch)[edit]




STS-122 begins its mission to deliver the Columbus laboratory to the International Space Station.


Fueling began at 05:26 EST, ahead of a planned 14:45 EST launch. The fuel sensors all performed as expected, and at 14:35 EST, Launch Director Doug Lyons gave Atlantis crewmembers the go to launch, with no constraints.[37][38]Atlantis launched on schedule, at 14:45 EST (19:45 UTC).[39] Main engine cutoff (MECO) occurred at 19:54 UTC.[37][38] After MECO and ET separation, the orbiter executed an OMS-2 engine firing to circularize the orbit, and put it on track to the International Space Station.[40] The crew opened the payload bay doors, deployed the Ku antenna, checked out and activated the shuttle's robotic arm, and downlinked the video footage taken during external tank separation to NASA managers.[41]



8 February (Flight day 2)[edit]


The crew of Atlantis spent the day performing a variety of tasks designed to prepare the shuttle for docking on Saturday, including the installation of the centerline camera, and the extension of the orbiter docking system ring.[42] A majority of the day's activities was devoted to inspecting the shuttle's thermal protection system using the Orbiter Boom Sensor System (OBSS). Early in the morning, the crew performed a burn of the Orbital Maneuvering System (OMS) engines to adjust the orbit in preparation for docking with the International Space Station.[43][44] During interviews with CBS and NBC in the morning, Expedition 16 Commander Peggy Whitson told reporters that since her birthday was Saturday, "My present is a new module that we're going to install on the station, I'm really looking forward to it."[42][43]


During the afternoon mission status briefing at Johnson Space Center, Lead Shuttle Flight Director Mike Sarafin said that there were no technical issues, and the mission was on schedule for docking on Saturday at 17:25 UTC.[45] He reported that the orbiter had sufficient consumables for a mission extension, but the decision on whether to extend the mission would be made no earlier than flight day five, to allow the team to evaluate the inspection data. If the mission were extended, Sarafin said the extra day would be inserted into day nine, following the third EVA. Chairman of the Mission Management Team (MMT) John Shannon reported that his team gave the official "go" for docking during their first on-orbit meeting. Shannon noted that the initial imagery given to the engineering team showed "absolutely nothing of concern", with only one foam piece appearing to possibly impact the vehicle, 440 seconds into ascent.[45] Shannon said any item that late into ascent would not have enough energy to do any significant damage if it did strike the orbiter, and the managers did not consider it an issue.[44][45] Shannon said the team would evaluate the data obtained during Saturday's Rendezvous Pitch Maneuver, performed prior to docking, as well as the imagery from the OBSS survey, and during flight day 3's MMT meeting a decision would be made whether a focused inspection of the orbiter's thermal protection system would be needed.[45] Shannon noted that the improvements to the external tank have proven to be "phenomenal", and was pleased with the initial data.[45]



9 February (Flight day 3)[edit]




The Columbus module seen in high detail from the station, in this image taken by the Expedition 16 crew, during their photography of Atlantis prior to docking on flight day three.


The shuttle crew worked through the rendezvous timeline in the morning, including several adjustment burns of the orbiter's engines to refine the path towards the station. Between 16:24 and 16:31 UTC, Atlantis performed the Rendezvous Pitch Maneuver to allow the station crew to use high resolution cameras and document the thermal protection system.[46] Extra images were taken of the starboard OMS pod as it was an "area of interest" due to the appearance of a raised blanket.[46]Atlantis docked with station at 17:17 UTC (12:17 pm EST).[47]Atlantis is the first orbiter to dock to the new position of the Pressurized Mating Adapter at the forward end of the Harmony module.


After working through a variety of leak check procedures, the hatches were opened between the shuttle and station at 18:40 UTC, and the two crews exchanged greetings and conducted a mandatory safety briefing. After the briefing, they began the rest of the day's tasks, including moving the station's robotic arm to grapple the OBSS, and then hand it off to the shuttle's robotic arm in preparation for future activities. The official exchange of Expedition 16 crewmembers Daniel Tani and Eyharts was completed in the evening, when they exchanged their Soyuz custom made seat liners, and Tani became a member of the STS-122 crew, while Eyharts began his position as Flight Engineer for Expedition 16.[47]


During the mission status briefing, Flight Director Mike Sarafin stated that one of the three General Purpose Computers (GPC) failed to start up correctly before the rendezvous, but it did not impact the rendezvous.[48] Sarafin also confirmed that they were investigating a slight tear in the thermal protection blanket on the starboard (right side) OMS pod.[46][48]


At 20:14 UTC, the ground team radioed the crew to alert them that the managers had decided to make a 24-hour delay to EVA-1, originally scheduled for Flight Day 4, and that Stanley Love would replace Hans Schlegel for EVA-1 on Monday.[49][50] During the post-MMT briefing, Mission Management Chairman John Shannon explained there was a "crew medical issue", but it would not impact the mission objectives. For reasons of medical privacy, Shannon said NASA can not disclose which crewmember is affected, and no details would be given as to the nature of the issue, but Shannon said it was not something to be concerned about.[49][51] Unconfirmed news reports claim that Schlegel had "lost his voice", and since communication is a critical function of an EVA, the decision to swap crewmembers was made.[48] Shannon also noted that Atlantis has enough consumables to extend almost two days; the mission operations team was looking at procedures to assist with power conservation, and the team hopes to add another day extension to the mission.[47]



10 February (Flight day 4)[edit]


The two crews spent their first joint mission day working through a focused inspection of the OMS pod blanket, reviewing the upcoming EVA procedures, and beginning the transfer of items from the shuttle to the station.[52] Earlier in the day, ESA confirmed the crewmember with the medical condition was Schlegel, but stated it was nothing serious and does not impact the health of any of the other crewmembers.[53] Tani and Eyharts spent several hours working through a variety of station familiarization procedures, designed to assist Eyharts in learning where items are on the station. Love, Walheim and Schlegel were given several hours in their daily timeline to go over the EVA.[52][54] Walheim and Love will spend the night in the Quest airlock in preparation for Monday's EVA.[52][54]


During the mission status briefing, MMT Chairman John Shannon stated that the rest of the mission will follow the plan, with no changes expected.[55] Commenting on the ongoing thermal protection system review, Shannon said "The thermal protection system inspections that we do are going extremely well, it's the fastest I've ever seen them done on a flight. We have completely cleared the bottom of the orbiter, there are no issues we are working on the bottom, and all of the reinforced carbon-carbon on the wings and the nose are completely cleared. We're gathering additional information on the right OMS pod. Atlantis is extremely clean."[55] The blanket would be evaluated more on Monday, and a decision regarding that area is expected to be made at the MMT meeting Monday evening. There were a few areas of interest around the windows that were also being evaluated.[55]



11 February (Flight day 5)[edit]




The Columbus module is lifted from Atlantis' payload bay using Canadarm2 during the mission's first EVA.




Leland Melvin and mission specialists working on robotic equipment in the US lab


After awakening, both crews began preparing for the mission's first spacewalk. Love and Walheim suited up, and the EVA began slightly ahead of schedule, at 14:13 UTC (09:13 EST). Assisting the spacewalkers inside the station and shuttle were pilot Alan Poindexter, and Mission Specialist Hans Schlegel.[56]


At 19:53 UTC (14:53 EST), Walheim and Love completed the preparations for the unberthing of Columbus from the payload bay, and with Melvin inside the space station working the robotic arm, the module was successfully lifted out of the payload bay. The first contact of Columbus with the station was at 21:29, and at 21:44, Eyharts and Melvin announced that Columbus was officially installed on its new home in orbit. "Houston and Munich, the European Columbus laboratory module is now part of the ISS," Eyharts radioed to the ground.[57] Walheim and Love began the re-pressurization of the Quest airlock at 22:11 UTC (17:11 EST), which marked the official end of their 7-hour, 58 minute EVA.



12 February (Flight day 6)[edit]




Hans Schlegel is working on outfitting Columbus.




A view at the cone end of Columbus.


The two crews spent the day working to activate and outfit the newest addition to the station, the Columbus module.[58] After the ground conducted a variety of leak checks during the crew's sleep period the night before, the crew was given the go ahead to put the module into what is called "Berth Survival Mode", which is a "functional mode": A minimal healthy configuration that can be maintained for extended time periods, if required. This involved powering up basic computers, power distribution units, and heaters. The crew completed the Berth Survival Mode activation quickly, and moved on to final activation. Representing the European partners, Schlegel and Eyharts were the first crewmembers to enter the module, performing a partial ingress at 14:08 UTC (09:08 EST).[59] Eyharts told the team on the ground, "We have a special thought at this moment for all the people in Europe and the U.S. who have contributed to the make up of Columbus. Especially to the space agencies, of course, the industry, but also all the citizens who are supporting space flight. This is a great moment, and Hans and I are very proud to be here and to ingress for the first time the Columbus module."[59]


By the afternoon, after allowing the circulation fans to work for several hours to clean out any residual particulates in the air, crewmembers were going in and out, working on hooking up water, thermal controls, and command and monitoring units. During the afternoon's mission status briefing, ISS Orbit One Flight Director Bob Dempsey noted that the two crews were far ahead of the timeline for activation, and excited about the station's new addition.[58]


In the early evening, the ground team radioed the crew to let Commander Frick know that the Mission Management Team had officially cleared the right OMS pod blanket for return "as-is", and there were no safety concerns.[59][60] The crew of Atlantis also took some time out to talk to reporters on the ground, one session in the morning, and another in the afternoon with CBS News, and Pittsburgh television stations.[61] Frick, a native of Pittsburgh, Schlegel, and Poindexter participated in the afternoon interviews. Asked how he was feeling, Schlegel said he was proud to be a part of the mission to deliver Columbus, that the "big mission" was what mattered, and he was feeling fine and ready to perform the mission's second EVA.[61] Walheim and Schlegel spent the night in the station's airlock in preparation for Wednesday's EVA.[58]



13 February (Flight day 7)[edit]




Rex Walheim moves a Nitrogen tank.


After awakening, the station and shuttle crews began working on preparing for the second EVA.[62] Station Commander Whitson and shuttle Commander Frick assisted Walheim and Schlegel in suiting up and working through the pre-EVA procedures. Eyharts and the rest of the crew aboard the station continued their work on outfitting and activating the new Columbus module, as well as working on transferring items between the shuttle and the station. The second EVA began officially at 14:27 UTC (09:27 EST) and ended at 21:12 UTC (16:12 EST). Walheim and Schlegel replaced a near empty Nitrogen Tank Assembly of the P1 truss with a new full tank that was brought in orbit by STS-122.[63]


During the mission status briefing, Lead ISS Flight Director Sally Davis announced that the managers had officially approved an additional docked day extension, and the team had also cleared the orbiter's entire thermal protection system for re-entry, pending late inspection results.[64] The right OMS pod blanket was determined to be of no issue for re-entry the day before, and the areas around the orbiter's windows that appeared damaged were fully cleared.[64] A tile that fell off during launch from the left Reaction Control System engine, called a "LOMS stinger tile" was deemed to be from a non-critical area, and was also cleared.[65][66]



14 February (Flight day 8)[edit]


The two crews had a light day scheduled, designed to give the crew some rest after a busy week of activities.[67] Several media interviews were conducted, including interviews with NBC News and a number of radio stations, as well as a special ESA event, a VIP call with German Chancellor Angela Merkel who called to congratulate Eyharts and Schlegel, as representatives of the European Space Agency on the successful delivery and installation of the Columbus module to the station.[67][68] The joint crews also did some maintenance tasks, including a waste water dump from the shuttle, transfer activities, and continued work on outfitting and activating the Columbus module.[68] Both crews participated in an EVA review in the late afternoon, and Walheim and Love spent the night in the station's airlock in preparation for the mission's final spacewalk.[69]



15 February (Flight day 9)[edit]


After awakening at 08:45 UTC, Walheim and Love spent the morning preparing for the mission's final spacewalk, assisted by Whitson and Frick, while the rest of the crew worked on Columbus outfitting, transfers, and preparation for robotics support during the EVA.[70][71] The third EVA officially began at 13:07 UTC (08:07 EST) and ended at 20:32 UTC (15:32 EST).[72]



16 February (Flight day 10)[edit]


While the ongoing task of outfitting the Columbus module continued today, Atlantis' propulsion system was fired for 36 minutes to reboost the station's altitude by 1.4 miles (2.2 kilometers) in preparation for the arrival of Space Shuttle Endeavour during STS-123. Also, all members of the shuttle and station crews participated in news conferences with American and European media.[73]



17 February (Flight day 11)[edit]


Hatches between Atlantis and the ISS were closed at 18:03 GMT.



18 February (Flight day 12)[edit]


Atlantis undocked from the ISS at 9:24 UTC (4:24 am EST).



19 February (Flight day 13)[edit]




Atlantis lands on runway 15 at the Kennedy Space Center.


The crew performed final inspections and preparations prior to landing.



20 February (Flight day 14, Landing)[edit]


The crew were cleared to close Atlantis' payload bay doors at 10:14 UTC, and this was completed by 10:28 UTC. At 12:32 UTC, NASA cleared Atlantis to land on its first opportunity at KSC. A two-minute-43-second de-orbit burn was conducted, beginning at 13:00 UTC. This was followed by entry interface at 13:35 UTC. Atlantis touched down on Runway 15 of the Shuttle Landing Facility at 9:07 am EST (14:07:10 UTC),[1] approximately 12 days, 18 hours, 21 minutes and 40 seconds into the mission.[1][74] Wheel stop occurred at 09:08 EST (14:08:08 UTC).[1][74]



Extra-vehicular activity[edit]



Three spacewalks were scheduled and completed during STS-122.[75] The cumulative time in extra-vehicular activity during the mission was 22 hours, 8 minutes.



































EVA
Spacewalkers
Start (UTC)
End
Duration
Mission
EVA 1

Rex J. Walheim
Stanley G. Love
11 February 2008
14:13
11 February 2008
22:11
7 hours, 58 minutes

Columbus power data grapple fixture installation, P1 truss nitrogen (N2) tank assembly preparation, power and data grapple fixture removal and installation to Columbus.
EVA 2

Rex J. Walheim
Hans Schlegel
13 February 2008
14:27
13 February 2008
21:12
6 hours, 45 minutes
P1 Truss Nitrogen (N2) tank assembly installation, stowage of old N2 tank assembly into payload bay, Station-to-Shuttle Power Transfer System (SSPTS) routing.
EVA 3

Rex J. Walheim
Stanley G. Love
15 February 2008
13:07
15 February 2008
20:32
7 hours, 25 minutes
Installation of SOLAR telescope, and EuTEF facility onto an External Stowage Platform (ESP) on Columbus, retrieval of failed Control Moment Gyroscope (CMG) that was replaced on STS-118 and stowed on ESP2, installation of failed CMG into payload bay, installation of keel pin cloth covers on Columbus, inspection and imaging of handrail outside airlock, and testing with overglove and velcro tool for rough areas.


Wake-up calls[edit]


NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15.
Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[76]





































































































Flight Day
Song
Artist/Composer
Played for
Links
Day 2
"Book of Love"

Peter Gabriel

Léopold Eyharts

wav mp3
Transcript
Day 3
"The Prairie Home Companion Theme Song"

Pat Donohue and Guy's All-Star Shoe Band and Garrison Keillor
Steve Frick[77]

wav mp3
Transcript
Day 4
"Maenner"

Herbert Groenemeyer

Hans Schlegel

wav mp3
Transcript
Day 5
"Fly Like an Eagle"

Steve Miller Band

Leland Melvin

wav mp3
Transcript
Day 6
"Dream Come True"

Jim Brickman

Rex Walheim

wav mp3
Transcript
Day 7
"Oysters and Pearls"

Jimmy Buffett

Alan Poindexter

wav mp3
Transcript
Day 8
"Consider Yourself (at Home)"

Lionel Bart

Stanley G. Love

wav mp3
Transcript
Day 9
"Marmor Stein und Eisen Bricht"

Drafi Deutscher

Hans Schlegel

wav mp3
Transcript
Day 10
"I Believe I Can Fly"

Yolanda Adams and Kenny G

Leland Melvin

wav mp3
Transcript
Day 11
"Hail Thee, Harvey Mudd"
Amy Lewkowicz

Stanley G. Love

wav mp3
Transcript
Day 12
"Over the Rainbow"/"What a Wonderful World"

Israel Kamakawiwo'ole

Dan Tani

wav mp3
Transcript
Day 13
"Always Look on the Bright Side of Life"

Eric Idle

Steve Frick

wav mp3
Transcript
Day 14
"Hail to the Spirit of Liberty"

John Philips Sousa

Alan Poindexter

wav mp3
Transcript


Media[edit]




Space Shuttle Atlantis launches from launch pad 39A at Kennedy Space Center as part of the STS-122 mission



See also[edit]



  • 2008 in spaceflight

  • List of human spaceflights

  • List of International Space Station spacewalks

  • List of Space Shuttle missions

  • Lists of spacewalks and moonwalks

  • Space Shuttle program



References[edit]


 This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.





  1. ^ abcde "Spaceflight Now – Mission Status Centre". Retrieved 20 February 2008..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output .citation q{quotes:"""""""'""'"}.mw-parser-output .citation .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-ws-icon a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-maint{display:none;color:#33aa33;margin-left:0.3em}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  2. ^ ab NASA (11 January 2008). "NASA Announces Space Shuttle Launch Targets". National Aeronautics and Space Administration. Retrieved 11 January 2008.


  3. ^ abcde McDowell, Jonathan. "Satellite Catalog". Jonathan's Space Page. Retrieved 24 May 2013.


  4. ^ abc William Harwood (2007). "STS-122 Quick Look Data". CBS News. Retrieved 26 November 2007.


  5. ^ abc Chris Bergin (2007). "STS-122 launch attempt scrubbed – ET sensor issue". NASA Spaceflight.com. Retrieved 6 December 2007.


  6. ^ Chris Bergin (2007). "PRCB debates STS-122 options – includes rollback and tank swap". NASA Spaceflight.com. Retrieved 29 December 2007.


  7. ^ Chris Bergin (13 January 2008). "STS-122: Engineers install ET-125's modified connector". NASA Spaceflight.com. Retrieved 17 January 2008.


  8. ^ NASA (2006). "NASA Assigns Crew for Columbus Shuttle Mission". NASA. Retrieved 20 October 2007.


  9. ^ NASA (2007). "NASA Announces Three International Space Station Crews". NASA. Retrieved 21 September 2007.


  10. ^ NASA (2007). "Space Shuttle Mission STS-122: The Voyage of Columbus". NASA. Retrieved 16 November 2007.


  11. ^ ab Chris Bergin (2007). "STS-122 Spacewalkers Gain Extra Protection". NASA SpaceFlight.com. Retrieved 1 December 2007.


  12. ^ William Harwood for CBS News (2007). "Spacewalkers to replace failed station component". Spaceflight Now. Retrieved 26 November 2007.


  13. ^ Robert Pearlman (2007). "NASA to launch NASCAR Daytona flags". collectSPACE. Retrieved 28 November 2007.


  14. ^ William Harwood (2007). "STS-122 Quick Look Data 2". CBS News. Retrieved 26 November 2007.


  15. ^ Robert Pearlman (2008). "Columbus sets sail for space station: Shuttle launches European lab, 300th American to orbit". collectSPACE. Retrieved 7 February 2008.


  16. ^ Chris Bergin (2007). "EVA-4 success with array repair". NASASpaceflight.com. Retrieved 3 November 2007.


  17. ^ Chris Bergin (2007). "Atlantis arrives at Pad 39A ahead of STS-122". NASA Spaceflight.com. Retrieved 10 November 2007.


  18. ^ NASA (2007). "NASA's Space Shuttle Processing Status Report". NASA. Retrieved 16 November 2007.


  19. ^ Chris Bergin (2007). "FRR approves December 6 launch date for STS-122". NASA Spaceflight.com. Retrieved 30 November 2007.


  20. ^ Tariq Malik (2007). "Shuttle Crew Arrives at NASA". Space.com. Retrieved 6 December 2007.


  21. ^ ab NASA (2007). "NASA Postpones Space Shuttle Atlantis Launch; Aims for Friday". NASA. Retrieved 6 December 2007.


  22. ^ Chris Bergin (2007). "STS-122 launch attempt scrubbed – ET sensor issue". NASA Spaceflight.com. Retrieved 6 December 2007.


  23. ^ William Harwood for CBS News (6 December 2007). "Fuel sensor problem scrubs shuttle launch". spaceflightnow.com. Retrieved 6 December 2007.


  24. ^ ab Chris Bergin (2007). "MMT begin to look at STS-122 flight rationale options". NASA Spaceflight.com. Retrieved 7 December 2007.


  25. ^ abc Chris Bergin (2007). "MMT decide to try for a Sunday launch attempt for STS-122". NASA Spaceflight.com. Retrieved 7 December 2007.


  26. ^ Kate Tobin (8 December 2007). "Space shuttle launch delayed until Sunday". CNN. Archived from the original on 9 December 2007. Retrieved 8 December 2007.


  27. ^ ab Marcia Dunn for the Associated Press (2007). "NASA Decides to Try for Sunday Launch". Washington Post. Archived from the original on 4 November 2012. Retrieved 8 December 2007.


  28. ^ abcd William Harwood for CBS News (2007). "Shuttle Atlantis counting down to Sunday launch try". Spaceflight Now. Retrieved 9 December 2007.


  29. ^ Chris Bergin (2007). "ECO sensor issues strike again – STS-122 moves to January". NASA Spaceflight.com. Retrieved 9 December 2007.


  30. ^ NASA (2007). "NASA Targets Space Shuttle Atlantis Launch on Jan. 10". NASA. Retrieved 13 December 2007.


  31. ^ abc William Harwood for CBS News (2007). "Atlantis launch delayed to January". Spaceflight Now. Retrieved 9 December 2007.


  32. ^ ab Chris Bergin (2008). "STS-122: Success! Hose retracted – Atlantis ready for countdown". NASA Spaceflight.com. Retrieved 6 February 2008.


  33. ^ Tariq Malik (2008). "NASA: Shuttle's Kinked Hose to be Stowed for Launch". Space.com. Retrieved 6 February 2008.


  34. ^ ab Dave Mosher (2008). "NASA: Space Shuttle on Track for Thursday Launch". Space.com. Retrieved 6 February 2008.


  35. ^ "Weather forecast now 70 percent 'no go' for Thursday launch". CBS News. 2008-02-06. Retrieved 29 August 2009.


  36. ^ "Update: Shuttle fueling begins; weather remains a concern". CBS News. 2008-02-07. Retrieved 29 August 2009.


  37. ^ ab Miles O'Brien and Associated Press (2008). "Shuttle blasts into space". CNN. Archived from the original on 9 February 2008. Retrieved 7 February 2008.


  38. ^ ab NASA (2008). "NASA's STS-122 Launch Blog". NASA. Retrieved 7 February 2008.


  39. ^ NASA (2008). "NASA's Shuttle Atlantis Begins Mission to the Space Station". NASA. Retrieved 8 February 2008.


  40. ^ NASA (2008). "Mission Events Summary – Orbital Insertion". NASA. Retrieved 8 February 2008.


  41. ^ NASA (2008). "STS-122 MCC Status Report #01". NASA. Retrieved 8 February 2008.


  42. ^ ab William Harwood for CBS News (2008). "Astronauts use boom to inspect Atlantis' heat shield". Spaceflight Now. Retrieved 8 February 2008.


  43. ^ ab Irene Klotz (8 February 2008). "European laboratory heads to space station". Reuters. Retrieved 8 February 2008.


  44. ^ ab Chris Bergin (2008). "Atlantis Ascent: Opening debris images classed as nominal". NASA Spaceflight.com. Retrieved 8 February 2008.


  45. ^ abcde William Harwood for CBS News (2008). "Shuttle performance near flawless going into docking". Spaceflight Now. Retrieved 8 February 2008.


  46. ^ abc Chris Bergin (2008). "Atlantis docks with ISS following RPM – focus on OMS Pod". NASA Spaceflight.com. Retrieved 9 February 2008.


  47. ^ abc NASA (2008). "STS-122 MCC Status Report #05". NASA. Retrieved 10 February 2008.


  48. ^ abc Dave Mosher (2008). "NASA Delays Spacewalk Because of Medical Issue". Space.com. Retrieved 10 February 2008.


  49. ^ ab William Harwood for CBS News (2008). "Spacewalk delayed 24 hours; German astronaut originally slated for excursion to be replaced by Stan Love". Spaceflight Now. Retrieved 9 February 2008.


  50. ^ Warren E. Leary (10 February 2008). "Astronaut's Health Problem Delays Spacewalk Mission". The New York Times. Retrieved 10 February 2008.


  51. ^ Mark Carreau (2008). "Astronaut's illness delays space lab's installation". The Houston Chronicle. Retrieved 10 February 2008.


  52. ^ abc NASA (2008). "STS-122 Mission Control Center Status Report 6". NASA. Retrieved 10 February 2008.


  53. ^ European Space Agency (2008). "Update on Schlegel medical situation". European Space Agency. Archived from the original on 13 February 2008. Retrieved 10 February 2008.


  54. ^ ab NASA (2008). "Flight Day 4 Execute Package" (PDF). NASA. Retrieved 10 February 2008.


  55. ^ abc William Harwood for CBS News (2008). "Schlegel could take Wednesday's spacewalk". Spaceflight Now. Retrieved 11 February 2008.


  56. ^ Liz Austin Peterson for The Associated Press (2008). "Spacewalk begins to install European lab". The Houston Chronicle. Retrieved 11 February 2008.
    [dead link]



  57. ^ William Harwood for CBS News (2008). "Columbus module attached to space station". Spaceflight Now. Retrieved 11 February 2008.


  58. ^ abc NASA (2008). "STS-122 Mission Control Center Status Report #11". NASA. Retrieved 13 February 2008.


  59. ^ abc William Harwood for CBS News (2008). "European astronauts begin Columbus activation". Spaceflight Now. Retrieved 13 February 2008.


  60. ^ Chris Bergin (2008). "Shuttle management decide against OMS Pod repair". NASA Spaceflight.com. Retrieved 13 February 2008.


  61. ^ ab William Harwood for CBS News (2008). "Schlegel won't discuss illness but says he's fine now". Spaceflight Now. Retrieved 13 February 2008.


  62. ^ Madeline Chambers and Irene Klotz (2008). "Astronauts work on station's cooling". Scientific American. Retrieved 13 February 2008.
    [dead link]



  63. ^ Chris Bergin (2008). "Extra docked day decision pending for STS-122 – EVA-2 begins". NASA Spaceflight.com. Retrieved 13 February 2008.


  64. ^ ab William Harwood for CBS News (2008). "Spacewalk ends; mission extended one day". Spaceflight Now.com. Retrieved 15 February 2008.


  65. ^ NASA (2008). "STS-122 Flight Day 8 Execute Package" (PDF). NASA. Retrieved 15 February 2008.


  66. ^ Chris Bergin (2008). "Extra docked day confirmed for STS-122". NASA Spaceflight.com. Retrieved 15 February 2008.


  67. ^ ab NASA (2008). "STS-122 Mission Control Status Report 14". NASA. Retrieved 15 February 2008.


  68. ^ ab Chris Bergin (2008). "Launch date changes approved – Atlantis performing without issue". NASA Spaceflight.com. Retrieved 15 February 2008.


  69. ^ NASA (2008). "STS-122 Mission Control Status Report 15". NASA. Retrieved 15 February 2008.


  70. ^ William Harwood for CBS News (2008). "Astronauts suit up for third and final spacewalk". Spaceflight Now.com. Retrieved 15 February 2008.


  71. ^ NASA (2008). "STS-122 Mission Control Status Report 16". NASA. Retrieved 15 February 2008.


  72. ^ William Harwood (2008). "Spacewalk begins". CBS News Space Place. Retrieved 15 February 2008.


  73. ^ NASA (2008). "STS-122 Mission Control Status Report 19". NASA. Retrieved 16 February 2008.


  74. ^ ab Live STS-122 coverage. NASA TV. 20 February 2008. Retrieved 20 February 2008.


  75. ^ William Harwood for CBS News (15 February 2008). "Spacewalk ends with all major objectives accomplished". Spaceflightnow.com. Retrieved 30 November 2008.


  76. ^ Fries, Colin (25 June 2007). "Chronology of Wakeup Calls" (PDF). NASA. Archived from the original (PDF) on 18 June 2010. Retrieved 13 August 2007.


  77. ^ Information from CAPT Stephen Frick USN, STS-122 mission commander.




External links[edit]







  • NASA's main shuttle page

  • NASA: Meet the STS-122 Launch Team

  • NASA: STS-122 mission summary

  • STS-122 mission animations


  • "STS-122". National Space Science Data Center.

  • CBS News Space Place – Full coverage of STS-122

  • ESA: STS-122 lift off info

  • Up to the minute STS-122 Shuttle Report

  • STS-122 Official Flight Kit Manifest
















Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-122&oldid=885692338"










Navigation menu



























(window.RLQ=window.RLQ||).push(function(){mw.config.set({"wgPageParseReport":{"limitreport":{"cputime":"1.164","walltime":"1.389","ppvisitednodes":{"value":7861,"limit":1000000},"ppgeneratednodes":{"value":0,"limit":1500000},"postexpandincludesize":{"value":245866,"limit":2097152},"templateargumentsize":{"value":15036,"limit":2097152},"expansiondepth":{"value":24,"limit":40},"expensivefunctioncount":{"value":5,"limit":500},"unstrip-depth":{"value":1,"limit":20},"unstrip-size":{"value":236090,"limit":5000000},"entityaccesscount":{"value":1,"limit":400},"timingprofile":["100.00% 1063.256 1 -total"," 50.25% 534.234 1 Template:Reflist"," 34.29% 364.587 65 Template:Cite_web"," 29.51% 313.790 8 Template:Infobox"," 19.74% 209.850 1 Template:Infobox_spaceflight"," 5.86% 62.298 1 Template:Spaceflight_crew"," 4.47% 47.521 11 Template:Cite_news"," 4.39% 46.730 1 Template:LaunchAttempt"," 4.27% 45.434 15 Template:Convert"," 3.74% 39.810 2 Template:Dead_link"]},"scribunto":{"limitreport-timeusage":{"value":"0.503","limit":"10.000"},"limitreport-memusage":{"value":7937660,"limit":52428800}},"cachereport":{"origin":"mw1308","timestamp":"20190328174607","ttl":2592000,"transientcontent":false}}});});{"@context":"https://schema.org","@type":"Article","name":"STS-122","url":"https://en.wikipedia.org/wiki/STS-122","sameAs":"http://www.wikidata.org/entity/Q155937","mainEntity":"http://www.wikidata.org/entity/Q155937","author":{"@type":"Organization","name":"Contributors to Wikimedia projects"},"publisher":{"@type":"Organization","name":"Wikimedia Foundation, Inc.","logo":{"@type":"ImageObject","url":"https://www.wikimedia.org/static/images/wmf-hor-googpub.png"}},"datePublished":"2005-11-29T18:26:17Z","dateModified":"2019-03-01T17:55:09Z","image":"https://upload.wikimedia.org/wikipedia/commons/a/a4/STS122_launch.jpg","headline":"human spaceflight"}(window.RLQ=window.RLQ||).push(function(){mw.config.set({"wgBackendResponseTime":114,"wgHostname":"mw1250"});});

Popular posts from this blog

Florida Star v. B. J. F.

Danny Elfman

Retrieve a Users Dashboard in Tumblr with R and TumblR. Oauth Issues