Category:Buildings and structures completed in 1207
Help
Category:Buildings and structures completed in 1207
Jump to navigation
Jump to search
Buildings and structures by year of completion: | 1202 • 1203 • 1204 • 1205 • 1206 • 1207 • 1208 • 1209 • 1210 • 1211 • 1212 |
Subcategories
This category has only the following subcategory.
R
► Religious buildings completed in 1207 (2 P)
Pages in category "Buildings and structures completed in 1207"
The following 2 pages are in this category, out of 2 total. This list may not reflect recent changes (learn more).
C
- Church of St. Paraskevi, Novgorod
D
- Duiske Abbey
Categories:
- Buildings and structures completed in the 13th century
(window.RLQ=window.RLQ||).push(function(){mw.config.set({"wgPageParseReport":{"limitreport":{"cputime":"0.012","walltime":"0.202","ppvisitednodes":{"value":224,"limit":1000000},"ppgeneratednodes":{"value":0,"limit":1500000},"postexpandincludesize":{"value":2730,"limit":2097152},"templateargumentsize":{"value":1824,"limit":2097152},"expansiondepth":{"value":7,"limit":40},"expensivefunctioncount":{"value":12,"limit":500},"unstrip-depth":{"value":0,"limit":20},"unstrip-size":{"value":0,"limit":5000000},"entityaccesscount":{"value":0,"limit":400},"timingprofile":["100.00% 196.068 1 Template:10years","100.00% 196.068 1 -total"," 97.84% 191.828 12 Template:LinkCatIfExists2"]},"cachereport":{"origin":"mw1319","timestamp":"20181012211052","ttl":1900800,"transientcontent":false}}});mw.config.set({"wgBackendResponseTime":136,"wgHostname":"mw1325"});});